REGL Phase-II 2x800 MW USCTPP, Raigarh, Chhattisgarh
Overview:
Cengrs Geotechnica Pvt. Ltd. conducted a comprehensive geotechnical investigation for the REGL Phase-II 2x800 MW Ultra-Supercritical Thermal Power Plant in Raigarh, Chhattisgarh. The project aimed to evaluate subsurface conditions and provide engineering recommendations for a safe and efficient foundation design.
Client and Project Details:
●Client: M/s Adani Power Limited
●Project Site: Raigarh, Chhattisgarh
●Purpose: Geotechnical investigation for plant infrastructure
●Completion Date: August 17, 2024
Key Findings:
●Stratigraphy: Silty clay and clayey silt layers up to 9.5 meters, followed by shale at deeper levels.
●Groundwater Depth: Encountered at 10–15 m below the ground level.
●Foundation Recommendations:
○Open and pile foundations based on load requirements.
○Use of rock socketing for structures requiring enhanced load-bearing capacity.
Technical Highlights:
●Field Investigations:
Drilled 54 boreholes and conducted 18 electrical resistivity tests (ERT) for grounding system design.
Performed cross-hole seismic tests and block vibration tests for dynamic soil analysis.
●Laboratory Testing:
○Shear strength and compressibility parameters were extensively analyzed.
○Rock quality designation (RQD) was determined for foundation stability.
●Engineering Recommendations:
○Liquefaction risk was deemed negligible under Zone III seismic conditions.
Client Impact:
M/s Adani Power Limited benefited from precise geotechnical insights, enabling them to optimize foundation designs for cost efficiency and structural stability while mitigating environmental and operational risks.
Conclusion:
Cengrs Geotechnica’s investigation ensured reliable foundation recommendations, supporting the expansion of Adani Power's infrastructure in Raigarh, Chhattisgarh.
Contact Cengrs Geotechnica Pvt. Ltd. at contact@cengrs.com or visit www.cengrs.com for tailored geotechnical solutions for your infrastructure projects.